Matriks Rencana PenangananMemuat data…
Logo Nindya
Matriks Rencana PenangananRencana penanganan
37 ruasPenanganan 51,7 mPSB 21,7 mNormalisasi 30 mPas. Batu BWS 30,9225 m³Semen 102 zak
NONAMA D.I / RUASStatusPANJANG RUASSTAPENANGANAN SALURAN (m)Panjang Penanganan (m)Panjang PSB (m)Panjang Normalisasi (m)Jalan Inspeksi (m)Ket. BangunanVOLUME EST.SUMBER QUARISUMBER DAYAVendor / MandorPelaksanaSurveyorKOEFISIEN RUAS
Usulan (m)Survey (m)KETHuluHilirRehab Sal.Peningkatan Sal.Galian SedimenGalian TanahEksistingPas. Batu BWS (m³)Realisasi (m³)Deviasi (m³)Plesteran (m²)Acian (m²)Bongkaran (m³)Pintu Air (Bh)PasirBatuBatu (m³)Semen (zak)Pasir (m³)Jml ExcavatorJml Tenaga (org)BWSRealisasiPlesteran
AKAB. BANGGAI123123138,730071,351,721,730030,922524,14136,781377,816217,360037,10710216,079700
1D.I. Rata123123138,730071,351,721,730030,922524,14136,781377,816217,36037,10710216,079700
1.1BRKi 2 - BGK 1Ruas di usulan dan survey ada12131300001313018,52514,46254,062546,61810,422,23619,6331,4251,11253,586
Segmen 1Rehab Sal.01313
1.2BGK 1 - BGK 2Ruas di usulan dan survey ada11111008,730071,338,78,73012,39759,67882,718831,19826,9614,877416,44671,4251,11253,586
Segmen 1Eksisting071,371,3
Segmen 2Peningkatan Sal.71,3808,7
Segmen 3Galian Sedimen809919
Segmen 4Galian Sedimen9911011
1.3BRKi 4 - BRKi 500000000000000001,4251,11253,586
2D.I Tomelongsong0000000000000000000000
2.1BTL Kn 0 - BTL Kn Rn 100000000000000001,4251,11253,586
2.2BTL Kr 2 - BTL.KR.2MK00000000000000001,4251,11253,586
2.3BTL Kn 1 - BTLKn 200000000000000001,4251,11253,586
2.4BTL Kn 1 - BTLKn 1 Kr00000000000000001,4251,11253,586
2.5BTL Kn Rn 1 - BTL Kn Rn 200000000000000001,4251,11253,586
BKAB. POSO00000000000000000000000
1D.I. Kilo Atas0000000000000000000000
1.1BK.0 Ka- BK.1 Ka00000000000000001,4251,11253,586
1.2BK.1 Ka- BK.2 Ka00000000000000001,4251,11253,586
1.3BK.2 Ka - BK.3 Ka00000000000000001,4251,11253,586
1.4BK.3 Ka - BK.4 Ka00000000000000001,4251,11253,586
1.5BK.4 Ka - BK.5 Ka00000000000000001,4251,11253,586
1.6BK.5 Ka - BK.6 Ka00000000000000001,4251,11253,586
1.7BK.0 Ki- BK.1 Ki00000000000000001,4251,11253,586
1.8BK.1 Ki- BK.2 Ki00000000000000001,4251,11253,586
1.9BK.2 Ki - BK.3 Ki00000000000000001,4251,11253,586
1.10BK.3 Ki - BK.4 Ki00000000000000001,4251,11253,586
1.11BK.1 Ki - BK.5 Ki00000000000000001,4251,11253,586
1.12BK.5 Ki - BK.6 Ki00000000000000001,4251,11253,586
1.13BK.6 Ki - BK.7 Ki00000000000000001,4251,11253,586
1.14BK.6 Ki - BK.8 Ki00000000000000001,4251,11253,586
1.15BK.8 Ki - BK.9 Ki00000000000000001,4251,11253,586
2D.I. Wanga0000000000000000000000
2.1BW.0 - BW.100000000000000001,4251,11253,586
3D.I Baluera0000000000000000000000
3.1BB.0 - BB.100000000000000001,4251,11253,586
CKAB. TOJO UNA UNA00000000000000000000000
1D.I Balingara0000000000000000000000
1.1BS.B.1 - BSB 1 Kr00000000000000001,4251,11253,586
1.2BBKa Ek 1 - BBKa 400000000000000001,4251,11253,586
1.3BBKa 4 - BBKa 500000000000000001,4251,11253,586
1.4BBKa 5 - BBKa 5 Hr00000000000000001,4251,11253,586
2D.I. Mpoa0000000000000000000000
2.1BBKn 6 - BBKn 700000000000000001,4251,11253,586
2.2BBKn 8 - BBKn 900000000000000001,4251,11253,586
DKAB. TOLI-TOLI00000000000000000000000
1D.I. Malomba0000000000000000000000
1.1BM.4 - BM.500000000000000001,4251,11253,586
1.2BM 4 Ki 1 - BM 4 Ki 1 Ka00000000000000001,4251,11253,586
2D.I. Kombo0000000000000000000000
2.1Bkb.3 - Bkb.3 Hr00000000000000001,4251,11253,586
2.2BKB Kn 2 - BKB.Kn 2 Hr00000000000000001,4251,11253,586
3D.I Silondolian0000000000000000000000
3.1BSd.2 - BSd.300000000000000001,4251,11253,586
3.2BSd.3 - BSd.400000000000000001,4251,11253,586
Ruas batal / belum pasti dikerjakanRuas baru / opsi setelah surveyRuas di usulan dan survey adaRuas di usulan tetapi ada bangunan eksisting/rencana bagi sadap di lapangan yang tidak terdata sehingga nama ruas berubah

Sel abu-abu dihitung otomatis. Ruas berstatus batal tidak ikut dijumlahkan. STA Hulu segmen = STA Hilir segmen sebelumnya.